250 kW

Image

Model

kW

Poles

Phases

IP Rating

TECO Te3 Cast Iron 3 Phase
TECO Te3 Cast Iron 3 Phase

0.55, 0.75, 1.1, 1.5, 2.2, 3, 4, 5.5, 7.5, 10, 11, 15, 18.5, 22, 30, 37, 45, 55, 75, 90, 110, 132, 160, 200, 250, 315, 355, 400, 450, 500

2, 4, 6, 8

3 Phase

55

TECO Te3 Severe Duty Cast Iron 3 Phase
TECO Te3 Severe Duty Cast Iron 3 Phase

0.55, 0.75, 1.1, 1.5, 2.2, 3, 4, 5.5, 7.5, 10, 11, 15, 18.5, 22, 30, 37, 45, 55, 75, 90, 110, 132, 160, 200, 250, 315, 355, 400, 450, 500

2, 4, 6, 8

3 Phase

66

TECO AFJE MAXe3 Mining
TECO AFJE MAXe3 Mining

110, 150, 185, 220, 250, 260, 300, 315, 375, 450

4, 6, 8

3 Phase

66

TECO Squirrel Cage
TECO Squirrel Cage

220, 250, 260, 280, 300, 315, 340, 355, 375, 400, 425, 450, 475, 500, 530, 560, 600, 630, 650, 710, 750, 800, 850, 900, 930, 1000

2, 4, 6, 8

3 Phase

TECO MAX-Ex (Exe,ExnA,ExtD)
TECO MAX-Ex (Exe,ExnA,ExtD)

0.18, 0.37, 0.55, 0.75, 1.1, 1.5, 2.2, 3, 4, 5.5, 7.5, 11, 15, 18.5, 22, 30, 37, 45, 55, 75, 90, 110, 132, 150, 185, 220, 250, 260, 300, 315, 375, 450

2, 4, 6, 8

3 Phase

66

Book a Consultation
Have questions or need assistance? Reach out to us through the contact form, and we’ll be happy to assist you.
This field is for validation purposes and should be left unchanged.
Drop files here or
Max. file size: 100 MB.